February 28, 2024

MarineCurrents

Current Maritime News | Clean Energy

GTT received order’s LNG Fuel Tank design for 4 Dual-Fuel Container Ship from Jiangnan Shipbuilding

2 min read
GTT received order's LNG Fuel Tank design for 4 Dual-Fuel Container Ship from Jiangnan Shipbuilding

On March 17, GTT received an order from Jiangnan Shipbuilding to design LNG fuel tanks for four dual-fuel 14,000TEU container ships of Singapore Pacific Line (PIL). It is reported that PIL placed an order for the four ships at Jiangnan Shipbuilding in early March. The new ships will be equipped with dual-fuel engines and use LNG or low-sulfur fuel oil.

It is worth mentioning that the new ship will also adopt an ammonia-ready design, which can be retrofitted with ammonia power in the future. Each vessel has an LNG fuel tank capacity of 13,800cbm and will be equipped with GTT‘s Mark III membrane containment system. These tanks will feature ammonia compatibility, providing shipowners with greater flexibility to operate in compliance with environmental regulations.

In addition to engineering services and on-site technical support, GTT will assist the shipowner in every aspect of the construction and operation of his first LNG bunker container ship: including the commissioning of LNG bunker tanks, first LNG bunkering operations, and specific containers Operation and maintenance of ship LNG fuel tanks. In addition, GTT will provide the G-Sim training simulator to provide training to the crew on the operation of LNG fuel tanks, which simulates the operation of the actual operation of the ship. Shipowners will also benefit from HEARS emergency response services and 24/7 technical assistance.

The vessels will also be equipped with the “GTT Digital” digital platform, a smart shipping solution for monitoring and optimizing their operational performance and environmental footprint.

It is reported that Jiangnan Shipbuilding will deliver the new ships between the second half of 2024 and the first half of 2025. After delivery, these ships will become the largest container ships in the PIL fleet and the first batch of LNG-fueled ships in its fleet. ship.

Philippe Berterottière, Chairman and CEO of GTT, said: “We are delighted that PIL has chosen our bunker technology and continued cooperation with Jiangnan Shipyard. We strongly believe that LNG is the preferred solution for reducing the carbon footprint of the shipping industry. Ordered The vessel’s ammonia compatibility also provides greater flexibility and demonstrates GTT’s continued commitment to securing shipowners’ investment in the context of having to continually adapt to environmental regulations.”

Source: eworldship

GTT获江南造船4艘双燃料集装箱船LNG燃料舱设计订单

3月17日,GTT公司收到江南造船的订单,为为新加坡太平船务(PIL)4艘双燃料14000TEU集装箱船设计LNG燃料舱。

据悉,太平船务于3月初在江南造船下单订造这4艘船,新船将配备双燃料发动机,采用LNG或者低硫燃料油。值得一提的是,新船还将采用氨燃料预留(Ammonia-ready)设计,能在未来进行氨动力改装。每艘船LNG燃料舱容量为13800立方米,并将配备GTT的Mark III 薄膜围护系统。这些燃料舱将具备氨兼容性的功能,为船东在满足环境法规下的运营提供更大的灵活性。

除了工程服务和现场技术支持外,GTT 还将协助船东完成其第一个 LNG 燃料舱集装箱船建造和运营的每一个环节:包括LNG燃料舱的调试、首次 LNG 加注作业,以及特定的集装箱船LNG燃料舱的运营及维护。此外,GTT 将提供 G-Sim培训模拟器,对船员提供 LNG燃料舱运营的相关培训,该模拟器可模拟船舶实际运营的操作。船东还将受益于 HEARS紧急响应服务以及 全天候24/7 技术援助。

这些船只还将配备“GTT Digital”数字化平台,这是一种智能航运解决方案,用于监控和优化其运营绩效以及环境足迹。

据悉,江南造船将于2024年下半年至2025年上半年之间交付新船,交付后,这些船将成为太平船务船队中最大的集装箱船,也是其船队中首批使用LNG燃料的船舶。

GTT 董事长兼首席执行官 Philippe Berterottière 表示:“我们很高兴PIL选择了我们的燃料舱技术,并且与江南造船厂继续进行合作。我们坚信液化天然气是减少航运业碳足迹的首选解决方案。所订购船舶的氨兼容性也提供了更大的灵活性,并表明 GTT 在必须不断适应环境法规的情况下,继续致力于确保船东的投资。”

来源:国际船舶网

Copyright © All rights reserved. | Newsphere by AF themes.